Blackstone Valley NEMBA East Side Trail Build

Date

4/14/19 (All day)

BV NEMBA NEW Trail Construction at the West Hill Dam.

We will be building 1 1/2 miles of new single track trail on the east side of river. Due to very limited parking available at the trail head volunteers should park at the lot near the ranger station located at

518 Hartford Ave E, Uxbridge, MA 01569 and either ride or walk (It's a long walk!) to the build site.

The tool trailer will be at the trail head.

We'll meet at 9:00 AM.  

Save time by signing NEMBA's once a year Trail Care Waiver.

Chapter

Blackstone Valley

Trail

Event Leader

Bill Dakai
dllib@charter.net