<?xml version="1.0" encoding="ISO-8859-1"?>

<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
	<channel>
		<title>NEMBA Forums - Trail Care Events</title>
		<link>http://www.nemba.org/forums/</link>
		<description />
		<language>en</language>
		<lastBuildDate>Sun, 19 May 2013 02:23:36 GMT</lastBuildDate>
		<generator>vBulletin</generator>
		<ttl>60</ttl>
		<image>
			<url>http://www.nemba.org/forums/images/misc/rss.png</url>
			<title>NEMBA Forums - Trail Care Events</title>
			<link>http://www.nemba.org/forums/</link>
		</image>
		<item>
			<title>NSNEMBA Trail Work Day 5/19 Boston Hill</title>
			<link>http://www.nemba.org/forums/showthread.php?28658-NSNEMBA-Trail-Work-Day-5-19-Boston-Hill&amp;goto=newpost</link>
			<pubDate>Fri, 10 May 2013 13:27:03 GMT</pubDate>
			<description>*Sunday May 19  
Boston Hill North Andover MA 
8:30 AM – noon* 
  
Location: Brightview construction site Route 114 North Andover MA (former location...</description>
			<content:encoded><![CDATA[<div><b>Sunday May 19 <br />
Boston Hill North Andover MA<br />
8:30 AM – noon</b><br />
 <br />
Location: Brightview construction site Route 114 North Andover MA (former location of base lodge for old Boston Hill Ski Area). <a href="http://goo.gl/maps/bM83T" target="_blank">Map</a>.<br />
 <br />
Final build day at Boston Hill. A couple of boardwalks and a connector trail at the bottom. Tractor will again be on site to move lumber.<br />
 <br />
Bring gloves, sturdy footwear, and water/snacks. We will have plenty of tools, but feel free to bring your own pick mattock, hammer, hand saw, items appropriate for boardwalk work.<br />
 <br />
Lunch will be provided, and a ride could well take place in the afternoon at Ward Reservation.<br />
 <br />
Due to the terrain and type of work, and unlike most of our trail days, rain or poor ground conditions may cause a cancellation. Look for a confirmation by 5/18.<br />
 <br />
Contact: Dan, <a href="mailto:trailwork@nsnemba.org">trailwork@nsnemba.org</a> or 978-618-8596<br />
<br />
<b>Next up: Sunday June 2, Beverly Commons</b></div>

 ]]></content:encoded>
			<category domain="http://www.nemba.org/forums/forumdisplay.php?22-Trail-Care-Events">Trail Care Events</category>
			<dc:creator>digger</dc:creator>
			<guid isPermaLink="true">http://www.nemba.org/forums/showthread.php?28658-NSNEMBA-Trail-Work-Day-5-19-Boston-Hill</guid>
		</item>
		<item>
			<title>Buck Hill Work TODAY!</title>
			<link>http://www.nemba.org/forums/showthread.php?28647-Buck-Hill-Work-TODAY!&amp;goto=newpost</link>
			<pubDate>Thu, 02 May 2013 14:30:56 GMT</pubDate>
			<description>HELPP!!! Buck Hill Trail Work Today! About 3:30-4:00, Joe Sloane will be meeting Ale Echandi, our DCR person in charge of the trail permit, and...</description>
			<content:encoded><![CDATA[<div>HELPP!!! Buck Hill Trail Work Today! About 3:30-4:00, Joe Sloane will be meeting Ale Echandi, our DCR person in charge of the trail permit, and 'snake expert'. Since it's May now, the permit defines the time period from now until October as 'snake season', and we can't do any work on the trail without a 'snake expert' with us. She's free today so we need to take advantage of that and get some work done. The trail is about 80%, and still needs some tough love. If you can make it, PLEASE CALL ME 781-254-8796  !  I'll let you know where to meet and exactly when. Tools and guidance provided. Plan to work about two hours.<br />
Steve Cobble&#65279;</div>

 ]]></content:encoded>
			<category domain="http://www.nemba.org/forums/forumdisplay.php?22-Trail-Care-Events">Trail Care Events</category>
			<dc:creator>SteveC</dc:creator>
			<guid isPermaLink="true">http://www.nemba.org/forums/showthread.php?28647-Buck-Hill-Work-TODAY!</guid>
		</item>
		<item>
			<title>4/28/13: Beaver Brook North Trail Work</title>
			<link>http://www.nemba.org/forums/showthread.php?28637-4-28-13-Beaver-Brook-North-Trail-Work&amp;goto=newpost</link>
			<pubDate>Fri, 26 Apr 2013 16:58:27 GMT</pubDate>
			<description><![CDATA[One more trail work opportunity for Sunday 4/28, if you can't make the Blue Hills one, this one is in Lexington at Beaver Brook North. This is part...]]></description>
			<content:encoded><![CDATA[<div>One more trail work opportunity for Sunday 4/28, if you can't make the Blue Hills one, this one is in Lexington at Beaver Brook North. This is part of the Western Greenway, which NEMBA supports and has helped develop:<br />
<br />
----------------------------------------------------------<br />
Dear Friends of the Beaver Brook Reservation,<br />
<br />
We completed about half of the landscape fabric installation to the <br />
long boardwalk on the Western Greenway Trail west of the Avalon at <br />
Lexington Hills housing complex this past Sunday. We are scheduling a <br />
second work date for this coming Sunday, April 28 to finish the work <br />
before the grass gets a head start this season. We will meet at 12:30 <br />
at the Cart Path Lane trail entrance off of Walnut Street in <br />
Lexington. Tools will be provided but if you have a hammer or staple <br />
gun, please bring it. Join us later in the afternoon if you can't meet <br />
us at 12:30.<br />
<br />
Thank you.<br />
<br />
John Dieckmann<br />
Keith Ohmart<br />
----------------------------------------------------------<br />
<br />
-Adam</div>

 ]]></content:encoded>
			<category domain="http://www.nemba.org/forums/forumdisplay.php?22-Trail-Care-Events">Trail Care Events</category>
			<dc:creator>1adam12</dc:creator>
			<guid isPermaLink="true">http://www.nemba.org/forums/showthread.php?28637-4-28-13-Beaver-Brook-North-Trail-Work</guid>
		</item>
		<item>
			<title><![CDATA[Blue Hills Trail Building 4/27 & 4/28]]></title>
			<link>http://www.nemba.org/forums/showthread.php?28635-Blue-Hills-Trail-Building-4-27-amp-4-28&amp;goto=newpost</link>
			<pubDate>Thu, 25 Apr 2013 12:58:57 GMT</pubDate>
			<description>ATTENTION: All trail builders, volunteers, NEMBA members:  
 
The BUCK HILL Trail building project in Blue Hills continues this coming weekend, both...</description>
			<content:encoded><![CDATA[<div>ATTENTION: All trail builders, volunteers, NEMBA members: <br />
<br />
The BUCK HILL Trail building project in Blue Hills continues this coming weekend, both Saturday and Sunday April 27th and 28th. We need your help! <br />
<br />
We will meet at Houghton's Pond Parking lot at 8:30AM (both days) to register all volunteers, and then break into groups. Tools will be provided.<br />
<br />
Come prepared with work boots, long pants, gloves, and bring water and a snack. We will work until noon, and lunch will be provided.<br />
<br />
Saturday work coincides with the annual DCR Parkserve, this is a great way to get directly involved with building a new! trail and advocating MTBs in the Blue Hills.</div>

 ]]></content:encoded>
			<category domain="http://www.nemba.org/forums/forumdisplay.php?22-Trail-Care-Events">Trail Care Events</category>
			<dc:creator>C.P.</dc:creator>
			<guid isPermaLink="true">http://www.nemba.org/forums/showthread.php?28635-Blue-Hills-Trail-Building-4-27-amp-4-28</guid>
		</item>
	</channel>
</rss>
