PDA

View Full Version : Lynn Woods Update 09.18.07


dieselbikes
September 18th, 2007, 09:21 AM
With the help of the local biking community, Dieselbikes was able to complete 100% of our forth trail day in Lynn Woods. As usual, this was another back breaking project but our main goal and a few extra’s were accomplished.

A section of Overlook Trail runs through a wet area that becomes flooded during heavy rain and stays muddy most of the year. To reduce and/or eliminate environment damage, we decided to install a few wooden ladder bridges to span the sections of wet areas. This past Saturday, the heavy rain did not stop 12 highly motivated volunteers who worked at a record pace installing each section of the bridges.

With over 3000lbs of pre-cut lumber, everyone went to work like a well oiled machine pulling rocks, clearing the trail bed and assembling the bridges. After hammering in over 1200 twist-tie nails, the team decided to keep pushing forward by armoring each end of the bridges and installing a few natural trail features.

Visit the link below for the full story and trail work day photos:
http://dieselbikes.com/trails/lyw/lyw_trail_work.htm

http://www.bustedspoke.com/Photos/bs8637.jpg

radair
September 18th, 2007, 10:53 AM
Nice work, Frank. Looks excellent!

Thanks for all your efforts in Lynn.

Longshanks
September 18th, 2007, 11:19 AM
Great job!

In the 3rd photo ("Second Bridge in the distance"), is that a log-ride on the right? It looks like it, but it's hard to tell if there's an exit at the end as there appears to be a tree in the way.