dieselbikes
August 21st, 2006, 10:17 AM
The forth Trail Maintenance Day for Lynn Woods was completed this past Saturday. This was straight forward trail project and we are happy to say 100% of it was completed. A new 400 foot (estimated) trail connector was cut to extend Overlook Trail up to Goliath Rock. Their currently was and old existing trail which was closed about 5 years ago due to severe erosion. With the continuing development of the Ballfield trail network, this connector will provide a flowing chute to Overlook Trail without utilizing the fire road.
Read the full story and see trail pictures at the direct link below:
http://www.dieselbikes.com/trails/lyw/lyw_trail_work.htm
Read the full story and see trail pictures at the direct link below:
http://www.dieselbikes.com/trails/lyw/lyw_trail_work.htm