GW
May 4th, 2005, 09:10 PM
Hi PVNEMBA,
Trail Work Days at Batchelor Street have been changed to Saturday, May 7th, and Saturday May 14th, both at 9:00 a.m.. Sorry 'bout the mix up. Call or send me an e-m l if you can make. :'(
By the way, if you haven't ridden here yet, you missing out on some serious trail design.
Ride Safe, GW ;)
Trail Work Days at Batchelor Street have been changed to Saturday, May 7th, and Saturday May 14th, both at 9:00 a.m.. Sorry 'bout the mix up. Call or send me an e-m l if you can make. :'(
By the way, if you haven't ridden here yet, you missing out on some serious trail design.
Ride Safe, GW ;)