March 26th, 2003, 01:24 PM
Anyone out there local to Chelmsford Ma. interested in working with me to help develop a trail system at a local conservation area? This area is approx. 70 acers and has the basis for a nice trail layout. Many of which already exist. I have been working on this for 1 1/2 years now and with the good weather am anxious to get moving with it. There is a perimeter trail which is approx. 1.6 mi long with many interconnectig trails. Probably not somewher you would want to drive more than 15 min to get to to ride but could offer 1/2 to 1 hrs of before work,lunchtime,or after work riding time. There are also numerous natural drops nice singletrack and 14 ft bridge crossings, rolling senic terrain...Anyone interested?...Bob