NS NEMBA Trail Work on Bay Circuit Bridge

Date

9/9/17 (All day)

NSNEMBA Trail Work – Bay Circuit Bridge #1

Saturday September 9, 2017
Boxford Rd./Linebrook Rd. Ipswich MA

Parking is a challenge with very limited spots near each of the 2 work locations. Parking/meet clarification to follow. Bridge build detail will meet at fire road gate on Linebrook Rd. south of Boxford Rd. intersection. Map: https://goo.gl/maps/gKiNCqaeW7E2. Prep and material move for bridge #2 meet at pull off south side of Boxford Rd. Map: https://goo.gl/maps/Jir9whhWguk

8:30 AM start until 12:30 PM.
Lunch provided, possible ride to follow, weather permitting. 
Only heavy rain/severe weather will cancel. Tools provided.
Please come equipped with long pants, sturdy shoes, work gloves, bug dope, water, snacks.

Contact: Dan, 978-61eight-8596, trailwork@nsnemba.org

Location

Ipswich, MA

Chapter

North Shore

Event Leader

Dan Streeter
trailwork@nsnemba.org
978-618-8596