NS NEMBA Bay Circuit Bridge Build #2

Date

9/23/17 (All day)

NSNEMBA Trail Work – Bay Circuit Bridge #2

Saturday September 23, 2017
Boxford Rd. Ipswich MA

Parking is a challenge with very limited spots near the work location. Find a likely spot and walk to bridge location. Meet at pull off south side of Boxford Rd. Map: https://goo.gl/maps/Jir9whhWguk or at bridge location on the BCT. Map: https://goo.gl/maps/13wpBb21k6y.

8:30 AM start until 12:30 PM.
Lunch provided, possible ride to follow, weather permitting. 
Only heavy rain/severe weather will cancel. Tools provided.
Please come equipped with long pants, sturdy shoes, work gloves, bug dope, water, snacks.

Contact: Dan, 978-61eight-8596, trailwork@nsnemba.org

Location

Ipswich, MA

Chapter

North Shore

Event Leader

Dan Streeter
trailwork@nsnemba.com
978-618-8596